A Review Of Cast in Situ Piles
As viewed from the figure down below, steady auger is used to drill the borehole, carry up drilled soil, and pour concrete although the auger is moved up. Therefore, the borehole does not will need casing or hydrostatic strain to avoid harm to the borehole wall.In which applicable, the paper considers the impact of reaction piles on the initial sti